Plate Girder Bridge (JSB)

Janson’s plate girder bridges (JSB) were designed for temporary applications, especially in areas with heavy traffic density and where a span of up to 43.5 metres is required.

The bridge sections are transported to the construction site as one piece as possible and subsequently installed and assembled into a complete bridge in minimal building time. The sections can be coupled both in the length and transversally and therefore offer an enormous variety of span options and passage widths. The sections are completely produced from high-quality steel and are equipped with steel bridge decks, which is reinforced with troughs.

Janson panel bridges were designed with any eye for assembly with the use of relatively small tools and small cranes. It is also possible to set up this bridge system horizontally in places where a crane has no excess at all. The bridge sections can be pre-assembled as separate units or can be transported partly pre-assembled to the destination of the bridge.

 

JSB-1

Solution
Bridges
Type
JSB
Section length
6, 9, 12 and 24m
Section width
3½m
Topping
Stone-chippings
Deck height including support
1.18m
Maximum free span
30m (Eurocode)
Guardrail
Traffic, pedestrian
External footpath
1, 1½ and 2m width

JSB-2

Solution
Bridges
Type
JSB
Section length
10½, 13½, 19½m
Section width
2½m
Topping
Stone-chippings
Deck height including support
1.21m
Maximum free span
40m (Eurocode)
Guardrail
Traffic, pedestrian
External footpath
1, 1½ and 2m width

JSB-3

Solution
Bridges
Type
JSB
Section length
10½, 13½, 19½m
Width
3½m
Topping
Stone-chippings
Deck height including support
1.21m
Maximum free span
43½m (Eurocode)
Guardrail
Traffic, pedestrian
External footpath
1, 1½ and 2m width

JSB-4

Solution
Bridges
Type
JSB
Section length
10½, 13½m
Section width
2½m
Material of the deck
Crushed stone
Deck height
1.4m
Max. free span
51m
Rainwater Drainage
Integrated
Guardrail
Yes, certified.

Plate girder bridge (JSB)

  • Bridge length up to 43.5 metres
  • Can be coupled in both width and length
  • Option of hinged coupling
  • Primary and secondary lanes
  • For general and heavy traffic
Plate Girder Bridge

Highlighted

M4 Huntercombe Spur
Project

M4 Huntercombe Spur

Janson Bridging (UK) Ltd. was selected to provide a temporary bridge for the Smart Motorways Scheme on the M4. A fourth lane in each direction is bein...
Blackwater Bridge Replacement Scheme, Monaghan
Project

Blackwater Bridge Replacement Scheme, Monaghan

Duration: 78 Weeks
B863 Invercoe Bridge Replacement
Project

B863 Invercoe Bridge Replacement

Background and Existing Site Information