Flyover bridge in Poznań
Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).
Project details
Solution
Beam Bridge
Type
JSK-JBB
Length
13,5m
Width
3,6m
Load
Eurocode LM1