JPB Pedestrian bridge in Szklarska Poręba

During the renovation of the bridge along ul. May 1st street in Szklarska Poręba, pedestrians can use the temporary footbridge of JPB-P system installed next to it. Thanks to good planning and coordination, the 21 m long and 2 m wide footbridge was delivered in less than 2 weeks from receiving the order, and then assembled on site in less than 3 hours!

Share on:

Project details

Solution
Pedestrian bridge
Type
JPB-P
Length
21m
Width
2m
Capacity
Eurocode LM4
Pedestrian bridge