JSB bridge in Szczawa
For the duration of the reconstruction of the bridge over the Kamienica stream along DW968 in Szczawa in Lesser Poland, we made available and installed, in cooperation with the client - Nowak Mosty - a single-span temporary JSB bridge with a length of 40.5 m and a deck width of 5 m. The bridge is intended to handle class B vehicle traffic and pedestrian traffic on a sidewalk separated from the deck.
Project details
Solution
Plate girder bridge
Type
JSB
Length
40,5m
Width
3,5m+1,5m
Weight
109t.
Capacity
kl.B