(DE) Bremen, Oberneuland Stop, Overpass

Share on:

Project details

Solution
Pedestrian bridge
Type
LPB-P
Total length
18,00m
Usable width
2,50m
Installation duration
1 Day
Height
7,50m
Top coat
Epoxyd-Resin with Split
Number of spans
1
Date of installation
May 2016
Rental period
30 Months
Tare weight
40 to.
Pedestrian bridge